10 Questions.
Quiz Summary
0 of 10 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Results
0 of 10 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Not categorized 0%
-
Thank you for completing this article, in doing so you have gained 0.1 CPD credits in Category 1.
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- Current
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 10
1. Question
Small risks can sometimes be tolerated, without solving them. Larger risks may need immediate strong action.
CorrectIncorrect -
Question 2 of 10
2. Question
It is not necessary to judge a risk against an acceptability target.
CorrectIncorrect -
Question 3 of 10
3. Question
A systematic approach to risk identification is crucial.
CorrectIncorrect -
Question 4 of 10
4. Question
Risk can be defined as which one of the following:
CorrectIncorrect -
Question 5 of 10
5. Question
Risk analysis can be done by which of three following methods:
CorrectIncorrect -
Question 6 of 10
6. Question
If no judgement about a risk can be made, nothing can be done with the information.
CorrectIncorrect -
Question 7 of 10
7. Question
SANS 31010:2010 relates to which one of the following:
CorrectIncorrect -
Question 8 of 10
8. Question
The ISO/IEC 17025:2017 standard requires the laboratory to manage risk:
CorrectIncorrect -
Question 9 of 10
9. Question
It is not necessary to define the boundaries of the system under consideration when doing a risk analysis.
CorrectIncorrect -
Question 10 of 10
10. Question
If the risks are too high, the assumptions must be reviewed or changes made to the design of equipment or procedures to mitigate or reduce the risk.
CorrectIncorrect